# Microsoft Excel by OpSmooth
> OpSmooth - Streamline your operations with secure and reliable integrations and automation for Mitti customers

Canonical page: https://integrations.mitti.com/partners/microsoft-excel-by-opsmooth
Marketplace: Mitti
Last updated: 2026-08-19
Logo: https://assets.partnerfleet.app/bo5h4huwesuz0qn08jfrzv507gq5

## At a glance
- Categories: [Office Applications](https://integrations.mitti.com/t/categories/office-applications)
- Features: [Inspections](https://integrations.mitti.com/t/features/inspections)
- Pricing: Starter, Growth, Custom, Free trial
- Website: [www.opsmooth.com](https://www.opsmooth.com/)

## Call to actions
- **Contact Us** — submit the contact form on https://integrations.mitti.com/partners/microsoft-excel-by-opsmooth

## Features
- **Excel and Mitti, Working Together** — Turn spreadsheet rows into pre-filled inspectionsWrite completion data back into your workbookMapped to your columns, templates, and business rules
- **From Schedule Sheets to Field Work** — Daily or weekly schedules become ready-to-run inspectionsSite, job, asset, and technician details pre-filledCompleted work can write status and report links back to the sheet
- **Keep Registers and Trackers Up to Date** — Push inspection results into asset or compliance registersCapture scores, dates, statuses, and report links automaticallyReduce export–clean–reimport loops for leadership reporting
- **Roll Out Work From Master Lists** — Use site lists, rosters, or open-actions sheets as the sourceBulk-create or refresh inspections across locationsIdeal for multi-site campaigns and recurring compliance work

## About
Most operations teams still run on Excel&nbsp; schedules, asset registers, site lists, audit trackers, and contractor rosters. Mitti is where the inspections happen. The gap between the two is usually people: retyping details, chasing completions, and maintaining trackers that fall behind the field.Custom Excel Automation by OpSmooth connects Microsoft Excel (OneDrive / SharePoint / Excel Online) with Mitii through a workflow designed around how your team already works. We can create or update inspections from spreadsheet rows, write completion data back into your workbook, or build a two-way process with the triggers, field mappings, and business rules you need.This is not a fixed connector or a rigid template you have to force your process into. Every implementation is custom: your columns, your SafetyCulture templates, your join keys, and your operational logic.Key capabilities:Create or update Mitti inspections from Excel rowsWrite completion data back to Excel report links, scores, timestamps, status, and selected answersSupport one-way or two-way workflows depending on the processMap to your existing columns and templates&nbsp; no forced spreadsheet formatTrigger on a schedule, on demand, on file change, or when an inspection is completedUse named Excel tables and stable join keys (job number, asset ID, site code, and more)Keep credentials and configuration separate for each customerCommon examples include turning schedules into inspections, keeping asset or compliance registers up to date from completed work, and rolling out bulk inspections from a master site or contractor list. Those are starting points not a fixed feature list. If your process lives partly in Excel and partly in Mitti, we can design the automation around it.Built for operations teams that need reliable handoffs between office spreadsheets and field inspections without adding more manual admin.Secure, reliable, and fully customised to your operational workflows.

## Team
- **Taras Maynoor — Founder** — Taras is an Ex-SafetyCulture CS Engineer. With 3+ years of experience delivering technical implementations for SafetyCulture's Enterprise Customers.

## Pricing
- **Starter** —  $130/mo AUD. Up to 500 jobs/month
- **Growth** —  $300/mo. Up to 1,500 jobs/month
- **Custom** — Talk to us

## FAQs
### What counts as a "job"?
Each row in your schedule that gets synced into a new Mitti inspection/asset counts as one job. Re-syncing an already-created inspection doesn't count again.

### What happens if I go over my monthly limit?
We'll give you a heads-up before you hit the cap. You can upgrade mid-cycle or overage is billed at a flat per-job rate whichever you prefer to offer.

### Does it work with my existing Excel/spreadsheet format?
Yes column headers are matched by common naming (e.g. "Job #", "Date", "Technician"), so most existing schedule sheets work without reformatting. We'll confirm compatibility during setup.
