# Frontline - Risk Register & Matrix
> Your registers hub for risk, chemicals, incidents and SDSs - synced with Mitti data.

Canonical page: https://integrations.mitti.com/partners/frontline-risk-register-matrix
Marketplace: Mitti
Last updated: 2026-08-19
Logo: https://assets.partnerfleet.app/2gqphavfxf6pkht2m1vxgvt3wo7s

## At a glance
- Categories: [Environment Health &amp; Safety](https://integrations.mitti.com/t/categories/environment-health-and-safety)
- Pricing: Risk Register & Matrix
- Website: [www.bravastech.com](https://www.bravastech.com)

## Call to actions
- **Contact Us** — submit the contact form on https://integrations.mitti.com/partners/frontline-risk-register-matrix

## Features
- **Central registers, every site** — Centralised risk register that rolls down to site-specific controls and owners, and rolls up for head-office comparison. No more one-spreadsheet-per-site sprawl - a venue manager sees their venue, the safety team sees every site ranked by what's slipping, the exec sees critical risk only.
- **A risk matrix that matches your framework** — Severity × likelihood scoring, inherent through residual, with automatic criticality. Different matrices per risk category or business unit - because one size never fits a board-approved framework. Compare inherent and residual side by side.
- **Owners, review cadences and approvals built in** — Every risk has an owner, a review cycle that actually fires, and an approval flow in the system instead of email. When the auditor asks "show me", you click.
- **KRIs against your board-approved appetite** — Key risk indicators tracked green/red against the appetite your board signed off. The board pack that used to eat half a morning of copy-paste generates in minutes - movements, trends and the why behind them.
- **Two-way Mitti sync** — Inspections, actions and incident reports your teams capture in Mitti flow onto the register as live control evidence. Register actions push back to the frontline. Nothing gets double-entered; nobody learns a second capture tool.
- **Start from the spreadsheet you already have** — Send us your Excel register and AI hands it back structured in Frontline within 24 hours - risks, controls, owners, matrix and all.
- **ISO-ready evidence trail** — The framework, controls, evidence and audit trail for ISO 45001 and ISO 31000 live in one place instead of forty spreadsheets. Reviewed cold by a NATA-accredited ISO auditor.

## About
Your risk register lives in a spreadsheet or legacy system that's a pain to keep up to date - owners listed but not acting, the same risk duplicated across sites, difficult for executives to know where risk actually sits, and days or weeks of admin every cycle to prepare board reports.You're likely already using Mitti for Inspections to verify controls, Actions as risk treatments, and Incident reports are the evidence on your register. There's no register on top of it.Frontline is that register. One central risk register that rolls down to site-specific controls and owners, and rolls up so head office can compare sites at a glance. A risk matrix you shape to your framework - inherent through residual, with different matrices per category or business unit if that's how your board thinks. Reviews and approvals happen in the system, not in email. KRIs track green and red against your board-approved risk appetite, and the board pack generates in minutes.And it's two-way with Mitti: what your teams capture in the field flows onto the register as live control evidence, and register actions push back to the frontline. One workflow, two surfaces - your teams keep working where they already work.Built with Mitti customers - manufacturers, hospitality, construction, energy, utilities, contractors, retailers, miners.Getting started is easy. Send us your current Excel register and we'll hand it back structured in Frontline within 24 hours - so your first look at the product is your own risks.

## Services
- **Implementation and migration - included** — We structure your existing register, configure your matrix and appetite framework, connect the Mitti sync and train your team. No implementation fee.
- **Register build from your documents** — Send your current register and framework; get it back live in Frontline within 24 hours as part of evaluation - so your first look at the product is your own risks, not demo data.
- **Ongoing support, 24-hour response** — Direct line to the team that builds the product, not a ticket queue.

## Testimonials
- "The most dynamic risk system I've seen. It's the first time the register and what's actually happening on site have been the same thing." — Colette O'Sullivan, Head of Governance, Risk & Compliance, Funlab (Strike Bowling, Archie Brothers · 60+ venues)
- "Frontline is building one of the most mature and innovative risk management platforms we have seen, which can leverage our incident management system to provide dynamic insights." — Dan Lopez, Senior WHS Manager, Funlab
- "Very impressive. It's a really mature solution across many elements." — John Smale, NATA-accredited ISO auditor

## Resources
- [90-second demo](https://www.loom.com/share/e885706f53b1459f88b47f2d84588ebe) — See the register, matrix, two-way Mitti sync and board reporting in 90 seconds.

## Team
- **Darcy Patterson — Sales** — Ex-Mitti; ran 100+ implementations.
- **James Gabb — Engineering** — Ex-Atlassian product lead for AI.
- **Matt Hinds — Growth** — Ex-Mitti product lead for Inspections and Issues.

## Pricing
- **Risk Register & Matrix** — Tailored

## FAQs
### Does Frontline replace Mitti?
Frontline sits on top of Mitti. Your teams keep capturing inspections, actions and incidents exactly where they do today; Frontline is the register, matrix and board reporting. Register actions push back into Mitti, so the platform you've rolled out becomes more valuable, not replaced.

### How does the two-way sync work?
Frontline connects to your Mitti account via the API. Inspections, actions and incident reports flow onto the register as live evidence against the controls they verify; actions raised in Frontline push back to your team's Mitti workflow.

### We already have a risk register in Excel. How do we move it across?
Send it to us. We can structure it for you - risks, controls, owners, matrix - and we hand it back live in Frontline within 24 hours.

### Can the risk matrix match our board-approved framework?
Yes. Matrix dimensions, scoring, categories and appetite thresholds are configured to your framework - including different matrices per risk category or business unit, and inherent vs residual side by side.

### Is Frontline secure for our IT review?
Yes. Frontline is built enterprise-grade; with SOC 2, SSO advanced permissions and data residency.

### What does it cost, and are there per-user fees?
We price based on your needs - speak with our team.
